Domain 7 · Structured Problem Solving and Control · Sustaining gains
Is a control plan handed over to the process owner for every completed improvement, defining the measures, limits, reaction steps and responsibilities that keep the gains in place?
Why it matters: Gains fade when nobody watches the new process after the project team moves on. A control plan handed to the named process owner, with measures, limits and reaction steps, keeps the improvement in place.
What each level looks like (choose a level)
Control plan handover to process owners has most likely begun informally. Project teams typically hand over with a final presentation and move on, and nobody is named to watch the improved measures, so gains may fade unnoticed within months.
Control plan handover to process owners is emerging but not yet consistent. A template may exist but be completed only for some projects, or experienced Black Belts may agree monitoring informally with owners without writing it down, so responsibility after closure most commonly remains unclear.
Most completed improvements hand over a signed control plan stating measures, limits, check frequency, reaction steps and the accountable owner listed in the Process Ownership Model and RACI. Some owners may not review the measures regularly, typically once the project team has left.
Every completed improvement closes only with a control plan accepted by the process owner, and at least 90 percent of completed improvements still meet target 6 months after handover. Breaches trigger the reaction steps.
Control plan handover to process owners is routine and results hold. Plans are refreshed when owners, systems or processes change, sustainment failures are analyzed to improve plan design, and the share of gains sustained at 6 months stays above target.