Domain 4 · Critical Power Operations · Utility failure
Is a witnessed utility failure test run at each site at least every 12 months, proving transfer to generator and back without critical load loss, with results and defects recorded in the generator and transfer tests section in the Facility Test and Inspection Records?
Why it matters: Automatic transfer schemes that are never exercised end to end hide failed relays, mis-set timers and breakers that will not close, so the real utility outage becomes the first test. The result is dropped critical load at the worst moment and a costly, visible site outage.
What each level looks like (choose a level)
Utility failure transfer testing has most likely begun informally. Transfer to generator may be proven only when the utility actually fails, with no planned test, no pass criteria and no record of transfer times or defects.
Utility failure transfer testing exists in part. A test may be run at the main site but typically not at others, or engineers may simulate transfers informally without recording timings. Emergency procedures may not be at hand during the test.
Utility failure transfer testing rests on a witnessed test at each site every 12 months, under a method of procedure approved through change advisory board, with transfer and retransfer times, UPS discharge and defects recorded in the generator and transfer tests section in the Facility Test and Inspection Records and staff standing by with Emergency Operating Procedures. Timings may not be compared between years.
Utility failure transfer testing is measured. Transfer and retransfer timings and defect counts are compared across years for each site, defects such as a slow breaker are tracked to closure before the next test, and results are reviewed in the monthly facility operations review.
Utility failure transfer testing is proven in real events. Real utility outages transfer as rehearsed with no critical load loss, defects are found and fixed before a live event and degrading timings are corrected early.