Domain 2 · Solution Design and Demonstration
Before a contract is signed, does the delivery team review and accept the solution design, scope assumptions and technical commitments made in pre-sales?
Why it matters: Pre-sales can promise an integration, a timeline or a performance level that delivery cannot meet, and once the contract is signed the company either absorbs the cost or disappoints a new customer. Delivery review and acceptance of the design, scope assumptions and technical commitments before signature lets the people who must deliver say no while the deal can still change.
What each level looks like (choose a level)
Delivery review has most likely only begun as engineers sending a design to a delivery lead they trust. Most deals typically sign before delivery sees what was promised.
An approved delivery review step usually exists, but it is applied to the largest deals only and some delivery leads skip it. Acceptance is typically informal and not recorded on the deal.
The review step is approved and most deals follow it. Typically 75 to 90% of closed deals with a non-standard design have delivery acceptance before signature, below the locally set target of 100%.
Nearly every non-standard deal has delivery acceptance before signature, near the locally set target of 100%. Conditions set by delivery are most likely written into the signed scope.
Every non-standard deal has delivery acceptance before signature, at the locally set target of 100%. Delivery typically shapes designs early, and projects rarely open with disputes over pre-sales promises.