Domain 2 · Technology Sourcing Strategy · Lock-in
Before major commitments, is lock-in assessed (data formats, switching cost, proprietary features, exit time) and used to shape the decision and contract?
Why it matters: Once data sits in a proprietary format and staff and processes depend on vendor-specific features, price rises and poor service cannot be solved by leaving. Assessing lock-in before signature, while the organization still has leverage, lets it shape the architecture and the contract so that exit stays practical.
What each level looks like (choose a level)
Assessing lock-in has begun, most likely informally, with some architects raising portability in design reviews. There is typically no scoring, trigger or record.
A lock-in checklist most likely exists but is used on some deals or after selection. Results typically do not reach negotiators.
An approved assessment is done before most major commitments and shapes some terms. The share of major commitments assessed before signature is typically measured and still below the target of 100%.
Almost every major commitment is assessed before signature, with the share typically at 95% or more against the target of 100%, and mitigations most likely appear in contracts. Exit estimates are starting to be tested.
Every major commitment has a lock-in assessment before signature, holding the share at 100%, and mitigations are standard in contracts and designs. Estimates are typically accurate because they are checked against real exits.