Many value studies finish too late to change the design, and the savings they report are claimed rather than confirmed. Value management pays off before money is committed, when an agreed brief, function analysis and whole-life cost can still change what gets built.

Already have an account? Log in to start

Overview

A 45-question diagnostic across 6 domains that follows the value study job plan from end to end: the value management policy and program, study planning and information, function analysis and whole-life cost, creative options and evaluation, decisions, implementation and hand-off, and the capability, measures and improvement of the program. It answers one question: do your value studies reach decisions in time, and do they deliver the function the owner needs at the lowest whole-life cost?

Value management is the practice of studying an investment, project or product before money is committed, so that it delivers the functions its owner and users need at the lowest whole-life cost. When it works, studies are required by threshold, finish before the gate they inform, analyze the subject by function and cost, and hand accepted proposals to the people who change the design, the business case and the benefits. When it fails, studies happen too late, waivers empty the program, briefs are never agreed with the decision maker, ideas are ranked on criteria invented after the scoring, accepted proposals never reach change control and claimed savings are never confirmed by finance.

The model follows the value study job plan as a series of separate controls: the policy, sponsor, thresholds, timing at gates, waivers, funded program plan and standard procedure; screening, the brief, the team, stakeholder needs, the baseline cost, constraints and the information pack; function definition, classification, need checks, performance criteria, cost, worth and whole-life cost; idea sessions, screening, criteria agreed before scoring, like-for-like costing, risks, owner confirmation and value proposals; decisions, reports, implementation and hand-offs to change control, the business case, the benefits register and process improvement; and facilitator competence, training, measures, finance confirmation, lessons and the yearly program review. Three questions check AI used in cost estimating and option ranking. Benefit tracking after delivery, stage gate decisions, estimating method, change approval and process redesign belong to other practices and are tested here only at the point of hand-off.

The model is written for value management leads, executive sponsors and investment decision makers. Each question is scored on whether the practice is documented, implemented and effective, which shows policies that are optional in practice, studies that run without a whole-life cost basis and savings nobody has confirmed. It is part of the Business Excellence family and stands alone for any organization that commits capital, project or product funds, with nothing required first. Run it each year before the program plan for the next year is approved.

Who it is for

  • Value Management Lead
  • Value Study Facilitator
  • Executive Sponsor of Value Management

Also valuable for portfolio, program and project offices, finance business partners and cost estimators, design, service, asset and process owners, investment decision makers and consultants who facilitate value studies.

What you will gain

  • Find where value studies are not required where money is committed, are waived without approval or finish too late to change the decision.
  • Check that each study runs on an agreed brief, a multidisciplinary team, ranked needs, function analysis and a whole-life cost basis.
  • Show that accepted proposals reach change control, the business case and the benefits register instead of stopping at the study report.
  • Report only savings that finance has confirmed against the baseline, and AI estimates that a qualified estimator has checked.

What we assess: 6 domains

The domains follow the value study job plan, from the program that decides when studies are required to the hand-off of accepted proposals and the review of the program itself.

  1. 01 · 7 questions

    Value Management Policy and Program

    An approved policy and scope, a named sponsor and lead, thresholds that make a study required, the gate each study must finish before, sponsor-approved waivers with reasons, a funded annual program plan and a standard study procedure.

  2. 02 · 7 questions

    Value Study Planning and Information

    Screening and ranking of candidate studies, a brief agreed with the decision maker, a multidisciplinary team with an independent facilitator, ranked stakeholder needs, a baseline cost estimate, mandatory requirements and constraints and a pre-study information pack.

  3. 03 · 8 questions

    Function Analysis and Whole-Life Cost

    Functions defined from ranked needs, a function diagram, functions that serve no need flagged for removal, performance criteria agreed with users, cost allocated to functions, worth and value ratios, whole-life cost on enterprise appraisal rules and qualified checks of AI cost estimates.

  4. 04 · 8 questions

    Creative Options and Evaluation

    A structured idea session on poor-value functions, recorded idea screening, criteria and weights agreed before scoring, like-for-like whole-life costing of options, option risks, owner confirmation of performance, value proposals and team control of AI-assisted ranking.

  5. 05 · 8 questions

    Decisions, Implementation and Hand-Off

    Recorded decisions on each proposal, a timely study report, implementation owners and due dates, scope, cost and schedule changes through project change control before the design is changed, business case updates, benefits handed to the benefits register, process changes handed to the process improvement owner and follow-up to closure.

  6. 06 · 7 questions

    Capability, Measurement and Improvement

    Facilitator competence and certification, a signed confidentiality agreement from outside facilitators, role-based training, value management measures reported to the sponsor, savings confirmed by finance, a shared library of lessons and reusable ideas, AI estimate accuracy reviews and a yearly program review.

Sample questions

Two of the 45 questions, with what each of the five maturity levels looks like for that practice.

Domain 1 · Value Management Policy and Program

Does the policy set the stage gate by which each required value study must be complete, so its results reach the gate decision?

Why it matters: A value study that finishes after the design is fixed can only suggest changes that cost more to make than they save, so its proposals are rejected and the program looks like overhead. Setting the gate by which each required study must be complete puts the results in front of decision makers while the design can still change at low cost.

What each level looks like (choose a level)

Study timing has begun, most likely informally, with studies booked when a facilitator is free. There is typically no rule linking a study to a gate, so most studies report after the design is fixed.

Domain 3 · Function Analysis and Whole-Life Cost · AI

Where AI tools produce cost estimates, does a qualified estimator check each estimate against the approved estimating method before the study uses it?

Why it matters: AI tools can produce cost estimates in minutes, but an estimate with no traceable basis can carry wrong rates, missing scope or invented figures straight into the baseline and the option comparison. A check by a qualified estimator against the approved estimating method before the study uses the figure keeps the speed of the tool while making sure every number the decision maker sees can be traced and defended.

What each level looks like (choose a level)

Checking AI estimates has begun, most likely informally, with odd figures shown to an estimator. Most AI figures typically enter studies unchecked, so errors can reach decisions.

Every question guides your team

In the full assessment, each of the 45 questions comes with three kinds of guidance, so your team rates practices on evidence rather than opinion.

  • What evidence to look for

    The documents, records and data that show whether the practice is written down, actually done and proven to work.

  • Where to find it

    The registers, systems and reports where that evidence is usually kept, so you know where to start looking.

  • What good looks like

    A description of what good looks like at each level and how to get there including performance measurements.

How scoring works

Every question is rated on three tests, each None, Partial or Full: Documented: Is it formally defined and approved? · Implemented: Is it actually done, by every team that should? · Effective: Is it achieving its goal, with evidence to show it?

What each value management maturity level looks like

Your overall score, out of 100%, places you on one of five levels. Each level below is described for value management, so you can see where you stand today and what the next level asks of you.

1 · Initial 0–20%

Value management has begun, most likely informally.

Studies happen when an individual pushes for one, there is no policy or threshold, functions are not analyzed, and nobody can say what value studies saved or changed.

2 · Developing 21–40%

A policy, a procedure and some studies exist, but studies are optional in practice, often too late to change the design, and run without an agreed brief, a full team or a whole-life cost basis.

Savings are claimed rather than confirmed.

3 · Defined 41–60%

The program is defined and followed: required studies are identified by threshold, planned and funded, run on the standard job plan with function analysis and whole-life cost, decided on agreed criteria and handed to the owners of change control, the business case and the benefits register.

4 · Managed 61–80%

Value management is measured against locally set targets: studies finish before their gates, proposals are decided and implemented on time, savings are confirmed by finance, and the sponsor reviews program measures and acts on them.

5 · Optimizing 81–100%

Value management is how the organization commits money.

Lessons and reusable ideas feed every new study, facilitator competence and AI estimating are kept under review, and the yearly program review changes thresholds, timing and methods.

What you get

  • Maturity scores: Overall and for each of the 6 domains.
  • Evidence-backed gaps: Each gap tied to the document or record that proves it.
  • Improvement roadmap: What to fix first to reach the next level.
  • Focused and Intelligent reports: Executive, management and operations views.

Report options: from gaps to an improvement roadmap

Choose the depth of reporting you need, from a quick view of your gaps to a full plan for closing them.

  1. Step 1: Results dashboard

    Scores and gaps for each domain as soon as you submit, plus a data export for your own analysis.

  2. Step 2: Executive summary

    A short brief for leadership: where you stand and the three priorities that matter most.

  3. Step 3: Diagnostic findings report

    Domain by domain: what is written down, what is actually done and what is proven to work.

  4. Step 4: Improvement roadmap and action plan

    Phased initiatives from the first 30 days to 12 months, each tied to the gaps it closes.

Value Management KPIs to track

The five measures this assessment uses to show whether improvements hold.

KPI What it measures Target
Required studies complete before the gate Required value studies in the last 12 months completed before the gate decision they were set to inform 95% (suggested starting target, set locally)
Studies with an agreed brief Value studies in the last 12 months with a brief agreed by the decision maker before the first workshop 100% (suggested starting target, set locally)
Studies with criteria agreed before scoring Value studies in the last 12 months whose evaluation criteria and weights were agreed with the decision maker before scoring 100% (suggested starting target, set locally)
Accepted proposals raised through change control Accepted proposals that change scope, cost or schedule in the last 12 months raised through project change control before the design changed 100% (suggested starting target, set locally)
Reported savings confirmed by finance Implemented savings reported in the last 12 months confirmed by finance against the baseline cost 100% (suggested starting target, set locally)

Framework alignment

Questions are written in plain language and mapped to:

  • EN 12973:2020
  • ISO 10014:2021
  • ISO 21502:2020
  • ISO 21504:2022
  • ISO 21508:2026
  • ISO 9001:2026
  • ISO 56002:2019
  • ISO 31000:2018
  • APQC PCF 7.4
  • GAO-20-195G
  • HM Treasury Green Book 2026
  • AACE RP 40R-08
  • Managing Benefits 3rd Edition
  • NIST AI RMF 1.0

Frequently asked questions

What is a value management maturity assessment?

A structured self-check of how well an organization runs value studies on investments, projects and products before money is committed, from the policy and program to function analysis, option evaluation, hand-off and savings confirmation. It scores 45 practices across 6 domains on whether each is documented, implemented and effective, and gives a maturity level from 1 (Initial) to 5 (Optimizing).

Who should take part?

The value management lead leads, with finance, the executive sponsor, the portfolio or project office and the owners of study subjects. It starts with a 30-minute session with every area for the three questions that apply to everyone: the value management policy, the sponsor and lead, and the yearly program review.

How long does it take?

About 3 to 4 hours, starting with the 30-minute all-area session, plus 1 to 2 weeks to gather evidence if it is not already at hand, such as the policy, the program plan, a sample of study plans, cost models and study reports, and the implementation register. A reassessment takes 1.5 to 2 hours.

How often should we repeat it?

Every year before the program plan for the next year is approved, aligned with the yearly program review. Reassess within 60 days of a change of executive sponsor, a new stage gate or investment approval process, a large rise in capital or project spend, or the adoption of AI tools in cost estimating or option analysis.

Is this an EN 12973 audit?

No. It is a self-assessment aligned with EN 12973:2020 and related guidance on project, portfolio and investment appraisal. It shows where your value management program stands before an external audit or review; it does not replace one.

Does it cover value engineering and function analysis?

Yes. It checks that functions are defined as short verb and noun pairs drawn from ranked needs, classified as basic or supporting in a function diagram, checked against needs, given performance criteria agreed with users, allocated cost, compared with their worth to find poor-value functions, and estimated on a whole-life cost basis set by the enterprise appraisal rules.

How is value management different from benefits tracking?

Value management works before money is committed: what to build and at what whole-life cost. Benefits tracking works after delivery, to show whether the benefits were achieved. This model hands the expected benefits of each accepted proposal to the benefits register with a named owner, and tests stage gate decisions, estimating method, change approval and process redesign only at the point of hand-off.

Does it cover AI in estimating and option analysis?

Yes, where AI tools are used. It checks that studies use only AI tools the AI rules allow, that a qualified estimator checks each AI cost estimate against the approved estimating method before a study uses it, that the study team makes the final option ranking against the agreed criteria with the AI contribution recorded, and that the accuracy of AI estimates is compared with actual costs, with AI use limited or changed when accuracy falls short.

What should we have in place first?

Nothing is required: the model stands alone for any organization that commits capital, project or product funds. Where they exist, it uses the stage gate criteria, estimating procedure and change control, the budget and finance savings validation, the enterprise risk method, design inputs and the benefits register. Within the Business Excellence family, the organization-wide excellence assessment reads the savings it reports.

How much would it cost to have a consultant run this assessment?

A mid-market consulting firm would typically need about 94 hours, or 11.7 consultant days, to run a value management assessment of this scope (45 practices across 6 domains): scoping, evidence review, workshops, scoring, a written report and roadmap, and a readout. Quotes typically range from US$17,700 to US$26,100 (about US$20,900 at mid-market rates). This assessment gives your own team the same structured method, scoring and roadmap.

How long would a professional engagement take to evaluate our value management?

About 4 weeks from kickoff to the final readout: scoping and scheduling, workshops with each team, evidence review, then scoring, the report and the readout. With this assessment your team spends 3 to 4 hours in workshops, and your scores are ready as soon as you submit.

Will our sensitive company documents be analyzed or stored by AI?

No. You cannot upload documents or files to ITSGovernance, and we never store them. Your team reviews its own documents in-house and records only a rating for each practice (Documented, Implemented, Effective), plus any comments you choose to add. Our AI is never given your company name, and is used only to write guidance on the gaps in your answers. Keep comments free of names, system details and other confidential information.

Do your value studies change decisions before the money is spent?